3 parts to project: 1) Expand concrete apron at end of drive - consists of approximately two (2) 4 x 8 foot triangle sections (one on each side) so that the driveway flares out properly at the end. 2) Concrete patch holes and cracks on steps on side of building. 3) Fill in approximately 2 cubic yards of gravel in various holes across the driveway and smooth out.
Present condition of project area:
This is what the customer is envisioning: