I need all the below done to meet Cleve hts pos standards. I can provide access to the inside to do a detailed estimate after we talk. Please contact me directly at kupowein@gmail.com. Thanks, Lynn Basement/Main Room Provide and maintain a 3 foot clearance for all electrical panels. All panels must be readily accessible Properly seal gap at side structure-right from dryer vent Make drain fully operable at FLOOR-at tub Replace missing fireplace ash pit door. AT chimney-Missing Properly install a bonding jumper at a water meter using 4 AWG copper wire and approved grounding clamps Properly repair Floor Area-near stairway-loose mortar Storage Area: Resplace missing cover to x2 at junction box –at ceiling Properly terminate conductor(s) at Ceiling Living Room Stairway Replace missing door knob(s) at Entry hallway Properly install an approved manual shut-off valve to gas line for ?? Second Floor –Bedroom Hall Replace and paint to conform, damaged/missing trim_DOOR FRAME DAMAGED AT Porch Door Attic Properly install an approved manual shut-off valve to gas line________I posted some pictures-it would only let me post a certain amount. Details are above and when selected I can forward the rest. thank you
Present condition of project area: