I have been in the process of finishing a section of the basement but it is taking me to much time in between free time. All that is left to do is to install the drop ceiling. Lay a prebacked carpet direct to the cement floor and cover stairs as well. No glue or tacks are required with this type of carpet as it is designed to be held down by trim. The carpet on the steps will need glued and stapled however. Baseboard trim and casing around four doors and one window. The trim, casing and doors will need painted white. I have all materials on hand.
Present condition of project area: