Need click lock 1/2 x 5 inch bamboo flooring installed thru morning room, kitchen, foyer, bath room and dining room. The dining room floor needs to be built by installing 1/4 plywood and roof felt to match existing floor. The dining room is 14 x14. Once flooring is down need quarter around installed around baseboard. All materials are provided. Appliances in kitchen will be out of way for installation.
Present condition of project area:
Service Provider 2113- :: This bid doesnt include painting? I usually caulk trim after install... I use a 1/4" narrow stapler to put down my luan board.. Staples also provided? I have the gun and compressor.. I've done alot of flooring, is there any thresholds to do? Thx
Customer :: No painting is required, if you can give me the staple type you need yes staples can be provided. Caulking can be provided. The are 4 doors- one sliding glass door the two outside entry doors and one door that leads to the basement. For the basement door a nose over piece was ordered. There is two transitions from wood to carpet about 20 ft long and transitions were ordered.
Service Provider 2113- :: I have done a ton of flooring installs, these other guys might be lower but i'll get it done right..