The repair is needed for an existing clay tile roof. There is a gap in the lower tiles where a squirrel has found its way in to the building and is disturbing the resident. There is additional restoration/repair work that will be needed to be scheduled in the near future to continue upkeep on the building so additional trips will be awarded to successful bidder. Thank you
Present condition of project area: